Hondo ISD is currently in the second phase of their high school improvement project. Phase II of this project includes a brand new 26,500 SF Fine Art’s building that includes an auditorium, dressing rooms, 2 band halls and an art room. The structure design includes a pre-engineered metal building that incorporates some brick siding and tall aluminum storefront windows.